Category: Completed projects

Preparation of technical and detailed designs for a 75 MW wind farm in Akmenė municipality and its connection to the 110 kV overhead line N. Akmenė – Žagarė

Completed projects Preparation of technical and working projects of the 75 MW total capacity wind farm, Akmenė district municipality, and its connection to the 110 kV overhead line N. Akmenė – Žagarė.  

Read More

Preparation of technical designs for the Klaipėda 330/110 kV substation, the 110 kV double-circuit cable line from the Klaipėda 330/110 kV substation to the new Dirvupiai 110/10 kV substation, the Dirvupiai 110 kV switchyard, and the Dirvupiai 110/10 kV transformer station

Completed projects Preparation of technical projects of Klaipėda 330/110 kV transformer substation, 110 kV two-circuit cable line from Klaipėda 330/110 kV transformer substation to the new Dirvupiai 110/10 kV transformer substation, Dirvupiai 110 kV switchyard and Dirvupiai 110/10 kV transformer station.  

Read More

60 MW wind farm in Mažeikiai district. Preparation of feasibility studies, technical and detailed designs for the electrical section

Completed projects Feasibility studies of the electrical part of the 60 MW wind farm in Mažeikiai district, preparation of technical and work projects.  

Read More

Preparation of the technical work project for the replacement of the TPP-63 US-6kV switchyard of AB ORLEN Lietuva

Completed projects Preparation of the technical work project for the replacement of the switchyard TPP-63 US-6kV of ORLEN Lietuva, AB.  

Read More

Preparation of a technical project for the connection of a wind farm with a total capacity of 70 MW to the 110 kV electricity transmission network of LITGRID AB, Telšiai r. sav.

Completed projects Preparation of the technical project for connecting the 70 MW total capacity wind farm, Telšiai district municipality, to the 110 kV electricity transmission networks of LITGRID, AB.  

Read More

Preparation of a technical project for the connection of a wind farm with a total capacity of 60 MW, Telšiai district municipality, to the 330/110/30 kV Telšiai substation 110 kV

Completed projects Preparation of the technical project for connecting the 60 MW total capacity wind farm, Telšiai district municipality, to the 110 kV switchyard of the 330/110/30 kV Telšiai transformer substation.  

Read More

Preparation of a technical project for the connection of a wind farm with a total capacity of 111.6 MW to LITGRID AB’s 330 kV electricity transmission network in Telšiai r. sav.

Completed projects Preparation of the technical project for connecting the 111.6 MW total capacity wind farm, Telšiai district municipality, to the 330 kV electricity transmission networks of LITGRID, AB.

Read More

Preparation of technical and detailed designs for a 65 MW solar power plant and its connection to the 110 kV OL Velžys-Vašuokėnai, Anykščiai municipality

Completed projects Preparation of the technical and work projects for the 65 MW solar power plant and its connection to the 110 kV OL Velžys-Vašuokėnai, Anykščiai district municipality.  

Read More

Preparation of technical and detailed design of 30/110 kV Kikoniokio TPP, Šilalė r. municipality, Traksėdžio sen., Pakasokis village.

Completed projects Preparation of the technical and work projects for the 30/110 kV Kikoniai VE transformer substation, Šilalė district municipality, Traksėdis eldership, Pakasokis village.  

Read More